A leaking roof. A failing HVAC system. A plumbing issue that keeps getting pushed to next year’s budget. These may seem like routine maintenance challenges, but across Canada’s public sector, delayed repairs are quietly becoming a multimillion-dollar problem.
Canada’s first National Infrastructure Assessment found that more than $126 billion worth of critical infrastructure is currently in poor or very poor condition, warning that delayed maintenance drives up long-term costs and increases operational risk.
That is the real cost of deferred maintenance. Repairs do not disappear when delayed. They compound until they become a crisis, especially in aging government facilities where decades-old infrastructure is already under pressure.
What is deferred maintenance?
Deferred maintenance is any needed repair, renewal, or replacement that gets postponed because of limited funding, staff, or resources. The work doesn’t go away. It sits in a growing backlog while the asset keeps wearing down.
Putting off maintenance doesn’t save money. It moves the cost into the future and usually makes it bigger. A $5,000 repair left alone can become a $50,000 emergency replacement, plus downtime, service disruptions, and safety risks.

Why the costs escalate so quickly
One of the biggest misconceptions about deferred maintenance is that postponing repairs saves money. In reality, it often does the opposite.
When facilities teams are forced into reactive maintenance, organizations lose the ability to control costs, schedule repairs strategically, and extend asset life. Emergency work typically requires expedited procurement, premium labour rates, temporary fixes, and operational disruptions.
We can already see the cost of waiting. Across Canada, 11% of core public infrastructure is in poor or very poor condition, contributing to a $237 billion repair backlog, while Crown-owned buildings average 49 years of age.
The longer repairs are delayed, the greater the risk of:
- Service interruptions
- Health and safety issues
- Compliance failures
- Rising operating costs
- Emergency capital expenditures
- Reduced asset lifespan
How facilities management breaks the cycle
More capital funding alone won’t solve this. Governments need to change how they manage their buildings, moving from fixing things when they break to ongoing asset stewardship.
Strategic government facilities management helps public sector organizations:
- See their portfolio clearly: Facility condition assessments show which buildings are at risk, what can be repaired and what needs to be replaced.
- Prioritize by risk: Condition data and work-order history direct limited budgets to the systems most likely to disrupt services.
- Invest in preventive maintenance: Planned work keeps small problems from becoming expensive failures.
- Plan across the full lifecycle: Asset lifecycle management connects daily operations to long-term capital planning, so investments happen at the right time.
- Lower operating costs: Energy upgrades to controls, HVAC and lighting cut ongoing costs and free up money for renewal.
An integrated facilities management (IFM) approach brings all of this together. Governments get one view of their entire portfolio, consistent performance standards, and a partner focused on protecting long-term asset value.
At Dexterra, we help public sector organizations move beyond reactive maintenance through integrated facilities management strategies that improve asset performance, reduce operational risk, and maximize the long-term value of critical infrastructure. Because the best time to address deferred maintenance is before it becomes tomorrow’s crisis. Contact us today!
FAQ
Government facilities can prioritize deferred maintenance projects using facility condition assessments, asset performance data, risk evaluations, and lifecycle planning. This allows organizations to address the most critical issues first, reduce operational risk, and make better use of limited budgets.
Preventive maintenance involves planned inspections and repairs to keep assets operating efficiently. Deferred maintenance occurs when necessary work is delayed. Investing in preventive maintenance helps organizations avoid costly backlogs, unexpected failures, and emergency repairs.
HVAC systems, roofs, plumbing, electrical systems, elevators, and building envelopes are among the assets most commonly affected by deferred maintenance. Delays can reduce performance, shorten lifespan, and increase safety risks.
Facility condition assessments identify the health and performance of building assets, helping organizations prioritize repairs and replacements. This data-driven approach allows government facilities to address high-risk issues before they become costly failures.
The time required to eliminate a deferred maintenance backlog depends on its size, available funding, and asset condition. Most organizations reduce backlogs through a combination of preventive maintenance, strategic capital planning, and phased infrastructure renewal.
